Login | Register
產(chǎn)品中心
Home > Products > Screw pumps > Long lead screw pump
view  
 
A Long Lead Screw Pump is a high-performance positive displacement pump designed for the precise and efficient transfer of viscous, abrasive, and shear-sensitive fluids in demanding industrial applications. Featuring an extended lead screw and rotor-stator mechanism, this pump provides continuous, low-pulsation flow while handling large volumes with minimal energy consumption. Its long lead design ensures smooth and stable operation, making it ideal for industries such as chemical processing, food and beverage, pharmaceuticals, oil and gas, and wastewater treatment. The Long Lead Screw Pump excels at pumping high-viscosity liquids, pastes, and slurries, including oils, resins, adhesives, syrups, and sludge, without causing shear damage or compromising product quality. Constructed from durable, corrosion-resistant materials, it offers excellent wear resistance, long service life, and reliable performance even under harsh conditions. The pump’s robust yet compact design allows for easy installation, maintenance, and integration into automated production systems, reducing downtime and operational costs. With strong suction capabilities, high efficiency, and energy-saving performance, the Long Lead Screw Pump is suitable for continuous, precise, and hygienic fluid transfer, providing a versatile and dependable solution for modern industrial processes requiring consistent flow, accuracy, and durability.
  • Long lead screw pump

    Long lead screw pump

    The Long Lead Screw Pump is a specialized positive displacement pump designed for efficient transfer of highly viscous, abrasive, and particulate-laden fluids. Distinguished by its extended lead rotor, this pump delivers steady, non-pulsating flow over long distances and is ideal for applications requiring consistent metering, high pressure, or precise dosing.

    Send Inquiry

This website uses cookies to ensure you get the best experience on our website.

Accept Reject
兴国县| 湘潭市| 郸城县| 张家川| 延长县| 盐源县| 错那县| 南通市| 靖州| 修文县| 隆尧县| 玉林市| 永年县| 滨州市| 昌吉市| 建水县| 怀仁县| 常州市| 宜兴市| 东阳市| 名山县| 昌江| 喀喇| 都安| 腾冲县| 曲沃县| 安图县| 鲜城| 疏附县| 石林| 昭苏县| 汉阴县| 霍城县| 璧山县| 甘孜县| 灵山县| 石台县| 余姚市| 望都县| 巍山| 南康市|